Skip links

APLNG RORO Protection

Subcon > Case Study > APLNG RORO Protection
Client: Bechtel

As part of the port upgrades for the new build LNG terminal, the Fisherman’s Landing Roll-on, Roll-off (FLNE RoRo) Ramp required additional scour protection for the larger vessels now frequenting the port.

Subcon scope

Supply scour protection system for the FLNE RoRo Ramp, including;

  • Engineering design of concrete mattresses and associated anchors
  • Fabrication of mattresses
  • Provision of supervision, labour, moulds, concrete, lifting frames, crane and workshop
  • Installation technical advisor

Download Case Study