Skip links

Merimbula Engineered Reef

Subcon > Case Study > Merimbula Engineered Reef
Client: NSW Government, Department of Industry

The NSW Department of Primary Industries commissioned the installation of an artificial reef off the coast of Merimbula, on the Sapphire Coast of New South Wales.

Subcon scope

Subcon performed the design, construction and installation of 2 x 90te Fish Tower modules giving the engineered reef a total volume of 1,020m3.

The Fish Tower modules were designed to target a variety of marine biota, Australian design has been positioned in approximately 30m water depth and is based on our proven modules previously installed to the south of Rottnest Island.

Download Case Study