Subcon BOBBs have four, extra-long lift points sewn into the bag. Once the base restraint loops are released, the base of the bag will fully open, deploying the contents precisely. Compared to conventional chute designs, Subcon BOBBs improve safety by ensuring 100% of the material is deployed and none is returned back to the deck. They are provided with NATA endorsed batch load test certification. When used in conjunction with our hydraulic deployment frame they allow for the fast and accurate deployment of materials underwater. Offshore Bottom Opening Bags
Stabilisation
- Pipe Clamping Mattress (PCM)
- Subcon Scour Collar
- Articulated Concrete Mattresses
- CoastMat
- X-Matt™
- X-Span™
- Frond Mattress
- CoastRock
- GroutMat
- Sleepers
- Culverts
- Anchors and Clump Weights
- Scour Skirts
- Subcon Standard Formwork
- Subcon Custom Formwork
- Offshore 2te Bulk Bags
- Offshore Bottom Opening Bags
- Flying Lead Stabilisation Bags
- 40kg Saddle Bags
- GabionBag
- 20 & 25kg Sand/Cement/Mortar Bag
- Subsea Grouting Turntable
- SHR 350 Hose Reel