Skip links

Tag: Case Study

Exmouth Integrated Artificial Reef

King Reef - Integrated Rig to Reef Subcon > Case Study Client: BHP / NERA / Recfishwest Subcon and project partners WA Fisheries, Recfishwest, BHP, NERA established the first Integrated Artificial Reef in the Asia Pacific Region. The reef realises the innovative idea concieved by

Esperance Nearshore Artificial Reef

Esperance Nearshore Artificial Reef Subcon > Case Study Subcon has brought reef installation into the 21st century by utilising our custom, hands-free, robotic lift tools.  We have removed the need for divers and in the process made reef installation safer, faster, and more economical! Client:

Coogee Dive Trail

Coogee Dive Trail Subcon > Case Study Client: City of Cockburn Winner of the 2019 Western Australian Coastal Awards for Excellence, Coogee Maritime Trail established a dive trail along the southern breakwater at Port Coogee as part of Subcon's Living Coastlines Initiative. The underwater dive

Perseus over Goodwyn Scour Skirts

Fugro Monument Scour Skirts Subcon > Case Study Client: Furgro TSM Fugro approached Subcon to design a scour protection system for their transponder mudmats. The scour skirt was to be pre-fitted to the mudmat prior to deployment and be easy to deploy. The scour development

Fremantle Rail Bridge

Fremantle Rail Bridge Subcon > Case Study Client: Main Roads WA & Arup Scour occurred adjacent to the Fremantle Rail Bridge, to prevent further scour and ensure the foundation integrity. A report proposing several scour protection options was made by MP Rogers and associates. Subcon

Fremantle Rail Bridge

Fremantle Rail Bridge Subcon > Case Study Client: Main Roads WA & Arup Scour occurred adjacent to the Fremantle Rail Bridge, to prevent further scour and ensure the foundation integrity. A report proposing several scour protection options was made by MP Rogers and associates. Subcon

Upper Pyrenees Flying Lead Crossing

Flying Lead Crossing - Upper Pyrenees Subcon > Case Study Client: McDermott Macedon gas field is located about 100km west of Onslow in Western Australia. McDermott was contracted with the design, procurement, fabrication, transportation and installation of 77km of a 20 inch pipeline, subsea umbilicals

Sole Heavy Density Freespan Correction

Sole Heavy Density Freespan Correction Subcon > Case Study Client: Cooper Energy The Sole Development Project comprised of the drilling of two subsea production wells in the Sole Field, approximately 40km offshore in the Gippsland Basin and a subsea tie-back via 65km production pipeline and

Kingsford Smith Drive Scour Protection

Kingsford Smith Drive Scour Protection Subcon > Case Study Client: Lend Lease As part of the widening and upgrade of Kindsford Smith Drive in central Brisbane, Australia, Lend Lease contracted Subcon to design and supply 18,000m2 of scour protection along the road’s revetment interface with